DETAIL DOCUMENT
Animasi Metode Pelaksanaan Pembangunan Gedung Kuliah Tepadu 4 Politeknik Negeri Bengkalis
Total View This Week0
Institusion
Politeknik Negeri Bengkalis
Author
Sapitra, Sapitra
Subject
421 Teknik Sipil 
Datestamp
2021-09-13 13:59:23 
Abstract :
Bengkalis State Polytechnic has a vision to become a vocational college with national and international standards, to achieve these standards, supporting facilities and infrastructure are needed, one of which is an integrated lecture building. In the construction of the Integrated Lecture Building, an implementation method is needed. So that the delivery of the implementation method is easy to understand, the implementation method is delivered through 3D visualization in the form of 3D animation. In this implementation method using precast concrete implementation methods for pile foundations andmethods cast in situ for structural concrete work which includes pilecaps, sloof, columns, beams and plates, while the roof structure using lightweight steel rafts is in place. The results of this research are formed in a 3D animation video, the stages of implementing the integrated lecture building method 4 Bengkalis State Polytechnic which include site cleaning, mobilization, measurement and installation of bouwplank, pile work, pile cap work, sloof work, 1st floor column work, beam work and 2nd floor slab, 2nd floor column work, 3rd floor beam and slab work, 3rd floor column work, concrete beam and dak work, ladder work, and roof work. 
Institution Info

Politeknik Negeri Bengkalis