DETAIL DOCUMENT
Animasi Metode Pelaksanaan Pekerjaan Peningkatan Jalan H. Imam Munandar Dumai Timur (Flexible Pavement)
Total View This Week0
Institusion
Politeknik Negeri Bengkalis
Author
Kurniawan, Rezeki
Subject
421 Teknik Sipil 
Datestamp
2021-09-20 08:48:22 
Abstract :
This study aims to describe the process of implementing the method of road improvement work on the H. Imam Munandar - Dumai Timur road with an animation display. The method of carrying out the work used is based on the general specifications of the 2018 Binamarga. The data analysis used in this study is qualitative data analysis which will be explained descriptively to be able to describe the process of implementing the H. Imam Munandar road work - Dumai Timur road. Then from the results of the preparation of the method of implementing the road improvement work H Imam Munandar, a 3D modeled image will be displayed in the form of animation using the camera tracking method. 
Institution Info

Politeknik Negeri Bengkalis