Abstract :
The final project entitled a ?Power Plants With Simultaneous Utilization
Of Motors And Generators With Prime Battery Drivers
(Case study :
Generators)? conducted for six months carried out in bengkalis polytechnic
country majoringin electrical engineering, electrical engineering courses, this
final project is focused is focused on free energy genereting system, battery/accu,
DC motors, AC generators, transformers and rectifier diodes as a charger.battery
will supply dc motor as generator, output generator in the form of ac voltage that
will be reversed as battery charger and the rest is used other load
(lamp). The
results of the study show that the measurement of the generator voltage produces
150 ? 200 volts AC and can turn on the home lighting.