Abstract :
The Bengkalis area itself has many bridge constructions that are useful for smooth
transportation, one of which is the bridge at gg. Pinang, East Wonosari Village, Bengkalis
District, Bengkalis Regency. Currently, there are several problems with the bridge, including
the cracked railing and the connecting parts of the road and the asphalt bridge are damaged
which endanger the driver. From these problems it will be planned to design a bridge using a
bridge structure with a box culvert, for the implementation of a box culvert using a cast in situ
implementation method and the implementation method is applied in the form of 3D animation
using a 3D modeling application.
In the bridge design process for box culvert dimensions, referring to the standard
reinforced concrete culverts of the Directorate General of Highways 2016
Based on the results and discussion, the stages of the box culvert implementation using
the cast in situ method include site cleaning, mobilization, demolition of bridges and diversion
of road currents, measurement and installation of bouw planks, closure of waterways,
excavation of soil, installation of wooden chimneys, casting of K-125 work floors, work
subfloor slab, box culvert wall work, top floor slab work, curb work, formwork demolition and
concrete maintenance, wing wall work, embankment work, bridge oprit work, finishing. From
the results of the calculation of the volume of box culvert iron on each work item, the total
weight of iron is 2630.3 kg.