Institusion
INSTITUT TEKNOLOGI DIRGANTARA ADISUTJIPTO
Author
Rigen Widhari Nartha, Dwi
Subject
T Technology (General)
Datestamp
2024-02-15 08:18:19
Abstract :
The mighty flightschool in the hangar maintains maintenance on the piper pa28
trainees, which aircraft maintenance manual (AMM). Continuous inspection
activities include inspection, cleaning and replacement with specific time intervals.
On the piper pa28 implementation of the treatment of the piper pa28 flight hours, the
complete inspection was made of the total activity of the estimated 100 and 300 flight
hours. Implementation of the 600 flight hours will require an estimate of component
supply costs to prepare and minimize component supply costs. To minimize the cost
in determining the inventory of the components.
Analysis of the research involves a method of economic order indicators (EOQ)
by calculating reorder points, in which reorder points is the inventory cycle. Each
supply cycle takes place during a cycle of time (T), which means each (T) isreordered.
Length (T) equals the proportionate proportion of demand needs (D) that can be met
by (Q) and do total inventory costs (TIC) and multiplied by Microsoft word and excel.
The results of the testing were obtained a EOQ value of 312 units, a 46 unit
value and a TIC value of Rp. 1,466,686,709, which means for EOQ, roller and TIC
results (D), order costs (S), storage fees, per unit prices (P) and lead time (L).