RELAYOUT TATA LETAK FASILITAS DAN MATERIAL HANDLING MENGGUNAKAN METODE ACTIVITY RELATIONSHIP CHART (ARC) PADA BAGIAN PRODUKSI DI UPT LOGAM IKM BU YESSI YOGYAKARTA
Total View This Week0
Institusion
INSTITUT TEKNOLOGI DIRGANTARA ADISUTJIPTO
Author
Zaki Alghifari, Muhammad
Subject
T Technology (General) 
Datestamp
2024-02-27 03:11:16 
Abstract :
The layout is one of the operational strategic decisions that also determines the efficiency of the company's operations in the long term. A good layout will contribute to increasing company productivity. The purpose of this research is to understand the stages of the production process and then to identify the constraints related to the layout at IKM Yessi and submit a proposed layout that is by the use of the Activity Relationship Chart, to determine the degree of closeness relationship between work stations. Then propose adding material handling to facilitate product transfer. From the results of the analysis, it was found that the proposed layout has advantages, namely the flow of the production process in accordance with the stages of the production process, workers have a wider workspace, such as a sand mold that has less space and more organized road access. The time comparison between the initial layout which has a total time of 132 seconds or 2 minutes 12 seconds, and the new layout which has a total time of 127 seconds or 2 minutes 7 seconds, has a faster time difference of 5 seconds in the new layout. In addition to the proposed layout, there are also suggestions for additional material handling which are expected to make it easier for employees according to their working needs. With the analysis of the total transfer time, the result is a difference in time of 5 minutes 41 seconds, it is faster using material handling. 
Institution Info

INSTITUT TEKNOLOGI DIRGANTARA ADISUTJIPTO