DETAIL DOCUMENT
FINAL PROJECT PERFORMANCE ANALYSIS OF SOUTH MOJOPAHIT ROADS MOJOKERTO CITY
Total View This Week0
Institusion
Universitas Darul ulum
Author
Fauzi, fauzi
Subject
HG Finance 
Datestamp
2021-10-28 06:07:39 
Abstract :
Fauzi, 2021. Performance Analysis of the South Mojopahit Road, Mojokerto City. Final Project, Undergraduate Study Program, Faculty of Engineering, Department of Civil Engineering, University Darul 'Ulum Jombang, Supervisor I, Iwan Cahyono, ST., MT., Supervisor II, Ir. Ruslan Hidayat, M.Sc., MT. Mojokerto is one of the cities in the province of East Java which is quite densely populated and frequent problems of traffic jams. this matter causes the low performance of a road. This research was conducted on the Mojopahit street, Mojokerto City with the aim of calculating road capacity and performance under existing and planned conditions. Road performance analysis using the 2014 Indonesia Road Capacity Guidelines method. The results of the data analysis of the Mojopahit Road Section obtained the value of Traffic Volume Cross segment 1=619.88 cur/hour, segment 2=517.45 cur/hour, segment 3=598.27 cur/hour, segment 4=1495,13 cur/hour. While the results of the Road Performance Analysis Mojopahit in the existing condition, the capacity value ( C ) in Segment 1 is 2667.7 cur/hour, the value of the degree of saturation is 0.23. capacity ( C ) segment 2 = 2752.9 cur/hour, degree of saturation = 0.19. Capacity ( C ) segment 3 = 2345.6 cur/hour, degree of saturation = 0.26. And for the capacity (C) segment 4 = 1915.3 cur/hour, degree of saturation = 0.78. For the estimation of the performance of the Mojopahit road for 5 years In the future, the condition of segment 1 to segment 3 is still feasible, while for segment 4 is not feasible because the degree of saturation has reached 1.04, where the value has passed the maximum limit specified in the 2014 PKJI. 
Institution Info

Universitas Darul ulum