DETAIL DOCUMENT
Analisis pengendalian persediaan bahan baku yang efektif guna memperlancar proses produksi PT Chiyoda Industry Indonesia
Total View This Week0
Institusion
Universitas Islam 45
Author
Putri, Misti Dewi
Subject
Manajemen Operasional 
Datestamp
2022-09-16 06:39:54 
Abstract :
ABSTRACT This study aims to determine and analyze the inventory of raw materials, determine the optimal amount of inventory, and determine the cost efficiency of raw material inventory used by researchers at company PT Chiyoda Industry Indonesia. Theresults of the research used are the number of purchases of raw materials according to the company with the JIT method of 35.915 pcs. The EOQ method of purchasting raw materials in one order 50.890 pcs. The frequenoy of purchases made by the company?s JIT method is 12 times while the EOQ method is once a year. The cost of ordering according to the company?s JIT method policy is Rp2.635.350,00 while the EOQ method is Rp7.320.00,00. There is No. storage cost in the company?s JITmentod while the EOQ method is Rp70.215.692,00 the total cost of inventory for the company?s JIT method is not avatlable, while the EOQ method is Rp77.536.692,00 the total cost for the company?s JIT method is Rp2.635.350,00 while the EOQ method is Rp155.073.384,00 and with an overall average of Rp51.691.128,00 Keywords: Inventory control, raw materials, method JIT, and Method EOQ 
Institution Info

Universitas Islam 45