APLIKASI METODE CRASH PROGRAM DAN METODE FAST TRACK PADA PENENTUAN WAKTU DAN BIAYA OPTIMAL PROYEK PERUMAHAN GRANOLA HOUSING PT. FORKONT SATRIA NUSANTARA, PALEMBANG
Total View This Week0
Institusion
Universitas Sriwijaya
Author
BENO, OKTA
Puspita, Fitri Maya
Indrawati, Indrawati
Subject
QA911.Z54 Fluid dynamics--Mathematical models. Multiphase flow--Mathematical models. Turbulence--Mathematical models. Combustion--Mathematical models. Combustion--Mathematical models. Fluid dynamics--Mathematical models. Multiphase flow 
Datestamp
2023-05-09 07:34:31 
Abstract :
This study aim analyzes the accelerated completion duration of the Granola Housing of PT. Forkont Satria Nusantara, Palembang with crash program and fast track methods on the critical path that is sought using Critical Path Method (CPM), is then formulated in the linear program. where on crash program method using the alternative of adding four hours of work hours and implementing the system shift work. The results are known to the total cost of the project using the crash program method with the alternative of adding four hours of work which is IDR519,255,022 with accelerated duration of 35 days or more expensive 5.72% of the project cost in normal conditions.Whereas the total cost in alternative system implementation shift work using the crash program method namely IDR533,556,616 with an accelerated duration of 63 days or 8.64% more expensive than the project cost under normal conditions. Total cost using the fast track method has increase in indirect costs of IDR511,472,470 with accelerated duration of 63 daysor 4.15% more expensive than the project cost under normal conditions. Fast track method more effective and economical. Keywords: Crash Program, Fast Track, Program Linear. 
Institution Info

Universitas Sriwijaya