DETAIL DOCUMENT
ANALISA DAYA KELUARAN MODUL SURYA DAN SIMULASI PERHITUNGAN ENERGI BERKELANJUTAN (STUDI KASUS PLTS 15 kWp DI PULAU PANJANG, BANTEN)
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
WICAKSONO, DICKO AJI
Siregar, Masbah R.T
Subject
Teknik Elektro 
Datestamp
2019-11-08 04:22:19 
Abstract :
Power consumption has a role major in the implementation of development that aims to improve the welfare and economic level. But in reality, not all people can enjoy electricity , especially those living in remote or isolated areas which far from the city center like in Pulau Panjang, Banten. Thus , the government has built a source of electrical energy , one of them is Solar Power system. Most of them use electrical power that can sometimes exceed the power generated from a Solar Power system , so the Solar Power system are not able to fulfill their needs. The energy that can be generated from Solar Power system in Pulau Panjang is about 33 kWh/day. Therefore , it takes energy forecasting that aims to make the energy they need can be fulfilled according to the energy that can be generated by a Solar Power System in the future. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara