Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
WICAKSONO, DICKO AJI
Siregar, Masbah R.T
Subject
Teknik Elektro
Datestamp
2019-11-08 04:22:19
Abstract :
Power consumption has a role major in the implementation of development that aims to improve the welfare and economic level. But in reality, not all people can enjoy electricity , especially those living in remote or isolated areas which far from the city center like in Pulau Panjang, Banten. Thus , the government has built a source of electrical energy , one of them is Solar Power system. Most of them use electrical power that can sometimes exceed the power generated from a Solar Power system , so the Solar Power system are not able to fulfill their needs. The energy that can be generated from Solar Power system in Pulau Panjang is about 33 kWh/day. Therefore , it takes energy forecasting that aims to make the energy they need can be fulfilled according to the energy that can be generated by a Solar Power System in the future.