DETAIL DOCUMENT
PERENCANAAN PONDASI TIANG PANCANG SEBAGAI ALTERNATIF PONDASI PADA RUMAH SAKIT PRATAMA YOGYAKARTA.
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
SARI, DIAN PURNAMA
Septriyanna, Irma
Subject
Teknik Sipil 
Datestamp
2019-09-24 04:58:53 
Abstract :
Hospital is one of the health common facilities which need the supports facilities in it. The construction of pratama hospital in Yogyakarta used bored pile foundation. So, this paper will explain about the planning of pile foundation as alternative in pratama hospital Yogyakarta. The dimension of the planned bored pile is 45 cm with the depth 7 m. in compute the bear capacity of the pile and bear capacity of the group pile use cone penetration test (cpt) with aoki and de alencer method, Meyerhof method and philiponat method. Based on the computation done with several methods, obtained the result of maximum bear capacity. First the result with philiponat method is 426,73 ton and the second with Meyerhof method is 110,73 ton. The efficiency of Meyerhof pile foundation is 0,76 and philiponat method is 0,8 . meanwhile the result of minimum group bear capacity with Meyerhof method is 336,62 ton and the result of maximum group bear capacity with philiponat method is 1365,54 ton. For the planning of pile foundation, the more effective method used is Meyerhof method, which is have the bigger safety factor. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara