Abstract :
Loading that operates or works in parallel if there is a disturbance in one transformer
can cause overloading of other transformers. To prevent overloading transformers
operating in parallel must be equipped with OLS protection or Over Load Shedding and
in this scientific paper what will be discussed is OLS IBT - 2 on the Cawang 2,3-Depok
Subsystem 1. The loss of one IBT will overload the other IBT. The trip of a generator
connected to the subsystem will cause the IBT to overload and trip in a short time. OLS
on the IBT is a safety so that there is no overload on The IBT is by turning off part of the
consumer's load so that the load can be carried out. In this case, testing and settings
will be carried out on the OLS in IBT-2. The setting current for Over Load Shedding in
the OLS IBT-2 test is 1900 A. In addition to OLS ,also adjusts the OCR value by setting
thecurrent rating of 2250 A.