Abstract :
In this study, Solar Energy Power Plant planning will be made by utilizing office
roofs because it is in accordance with the regulation of the Minister of Energy and
Mineral Resources No.49 of 2018 regulating the basic things to encourage the
acceleration of solar energy development, especially rooftop solar (Solar Panels). In this
study using quantitative methods. Furthermore, designing solar power plants with field
studies to find out the conditions and estimate the capacity of the Solar Energy Power
Plant to be designed. After that, calculate the capacity and also perform energy
calculations on the Solar Energy Power Plant. This Solar Energy Power Plant is designed
to supply litrik supply with an estimated daily energy load requirement of around 39.81
kWh. In this Solar Energy Power Plant planning required land area, with 36 solar power
4 series and 9 parallel. the components needed in this planning are 2 SCC, 44 batteries
and 1 inverter with the amount of Solar Energy Power Plant per year 15,621 kWh / year
Performance Ratio (PR) in the Solar Energy Power Plant system as a reference that this
system is feasible to be realized with a value of 85%. Initial investment of Rp.380,180,000
which includes costs for Solar Energy Power Plant system components and installation
costs