Abstract :
Referring to the target of the National Electricity General Plan (RUKN) 2015-2034
of the Ministry of Energy and Mineral Resources in 2024 the electrification ratio
of all regions in Indonesia is 100%. Therefore, Togean as one of the mainstay
tourist destinations in Central Sulawesi Province must be immediately provided
with electricity facilities. However, with the constraints of Togean Island which is
far from the PLN electricity grid, several innovations need to be made, one of which
is the construction of a 70 kV SUTT Tower, and is expected to increase the
electrification ratio of PLN Tojo Una-Una Regency to 99.24% from the previous
96.83%. And the ratio of PLN-electrified villages increased to 83.56% from the
original 77.4% in Tojo Una-Una Regency. In addition, although from a financial
analysis it does not meet the standards, but with the importance of this development,
it can be continued on the basis that PLN is operationally feasible in terms of
distribution voltage on the SUTM and SUTR sides. Even though from a financial
review nothing was feasible, because the investment value was smaller than the
construction of PLTS and PLTD, the construction of SUTM with the SUTT tower
was more considered to be carried out.