DETAIL DOCUMENT
Analisis Kerugian Energi kWh Akibat Kondisi Kelainan kWh Meter 1 Fasa Pada Pelanggan Tegangan Rendah PT. PLN ULP Nabire
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Rasyid, Faturrahman
Pawenary, Pawenary
Subject
Teknik Elektro 
Datestamp
2023-06-19 06:37:55 
Abstract :
Based on energy loss data at PT. PLN ULP Nabire per semester 1 of 2022, PLN experienced a loss of 9.70% of the total kWh net production of 59,467,940 kwh. If converted to financial losses, it is estimated that PLN will suffer a loss of ±86 billions. Facing a loss of this magnitude, it is necessary to map and trace which/what aspects are the cause of the loss, so that it can be followed up immediately in order to prevent losses from getting bigger. One of the causes of energy losses is at the energy transaction point, which is the benchmark for customer payments with PLN, kWh meters. In some cases, the kWh meter installed at the PLN customer does not work properly. In this study the focus of the problem is on the case of the kWh meter jamming, the losses it causes, and the follow-up carried out by PLN to reduce energy losses. This research will use a quantitative methodology, which is a method that is carried out systematically and uses mathematical models by processing existing primary electricity data. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara