Pengendalian Biaya Dan Waktu Pada Proyek Pembangunan Gedung 3 Lantai Desa Tugurejo Kecamatan Ngasem
Total View This Week0
Institusion
Universitas Kadiri
Author
Andrianta, Andrianta
Subject
TA Engineering (General). Civil engineering (General) 
Datestamp
2022-02-25 02:58:49 
Abstract :
How to optimize the acceleration of the duration of the construction project in the 3 Floor Building, Tugurejo Village, Ngasem District, is to add the number of working hours (overtime) from 4 working hours (overtime) to 7 working hours (overtime) thus acceleration the project duration for an optimum 16 days, so that turn around time delays can be minimized. In an efford to accelerate the duration of the 3-story building construction project in Tugurejo Village, Ngasem District, which will require a normal cost of Rp 1.636.731.021 minus the direct costs of work of Rp 1.352.670.265, the duration of the acceleration cost for the 3-story building construction project is Rp 1.636.731.021 ? Rp 1.352.731.670.625 = Rp 284.060.756. Key words : Building Construction, Accelaration Project Duration 
Institution Info

Universitas Kadiri